Technical Quality

R & D Center


The R&D center has six working groups: mold group, process group, CAE group, project group, adjustment unit and inspection group. Each team performs its own duties, works together to ensure the normal and efficient operation of the R&D center, and continuously introduces R&D results with market value for the company.
Software has a variety of 2D and 3D engineering design and simulation software. In terms of testing equipment, there are spectrometers, friction coefficient testers, tensile testers, three-dimensional projection rapid testers, three-coordinates, metallographic microscopes, hardness testers and other equipment.

Production & Manufacturing


From the beginning of its establishment, the company has been committed to the design and manufacture of special cold-headed parts. For products that require multiple extrusions or punching, multi-station molding machines are used to make products in place at one time, reducing machining processes, and improving efficiency and products. Competitiveness has been greatly improved.

Quality System


Through the Chinese GB standard, the international ISO standard, the German DIN standard, the American ANSI standard, the British BS standard, etc., the raw materials used are mainly carbon steel, and the product grades are divided into Grade 4.8, 8.8 and 10.9.

0